Excavation in hardrock requiring blasting and disposal of excavated material (blastedmaterial) upto 50ft.(15m) lead,(including dressing and levelling to designated section). Grade III
Excavation in hardrock requiring blasting
Unit : CFT
Total : 31,459,747.50


