Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao - Progressive Technical Associates
Active Running Project National Highway Authority Verified · PC-1 Approved

Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao

Section Awaran – Jhaljao (54.80 Km)
Approved Contract Budget
Rs. 7,412.72 Million
National Highway Authority
Section Alignment
54.80 Km
Balochistan
Project Classification
Highway Construction
NESPAK
RUNNING

Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao:

Section Awaran – Jhaljao (54.80 Km)
Location: Balochistan
Client Agency: National Highway Authority
Supervising Consultant: NESPAK
Approved PC-1 Budget: Rs. 7,412.72 Million
Corridor Alignment: 54.80 Km
Engineering Sector: Highway Construction

Scope of Work

  • ✓ Earth Work
  • ✓ Sub-Base & Base Course
  • ✓ Surface Course & Pavement

Structures & Drainage Works

  • ✓ Structures (Box Culverts)
  • ✓ Structures (Slab Culverts)
  • ✓ Structures (Retaining Structures)
  • ✓ Structures (Bridges)
  • ✓ Drainage & Erosion Works
  • ✓ Ancillary Works

Strategic Importance & Engineering Scope.

Critical infrastructure analysis, socio-economic corridor connectivity, and comprehensive civil engineering benchmarks executed by Progressive Technical Associates.

Highway Construction • Balochistan
Executive Engineering Mandate
Execution of high-standard civil engineering works engineered to provide reliable, long-life arterial connectivity across challenging geological and environmental terrain.

Comprehensive Project Narrative & Strategic Value

Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao constitutes a pivotal arterial development managed by Progressive Technical Associates (Pvt) Ltd. Engineered to meet strict National Highway Authority benchmarks, this corridor enhances freight transit efficiency, ensures all-weather accessibility across rugged terrain, and delivers durable highway and structural assets for long-term socio-economic growth.

Topography & Route
54.80 Km
Engineered across demanding terrain with precision rock cutting, hill excavations, and subgrade stabilization.
Socio-Economic Value
Arterial Transit Corridor
Unlocks uninterrupted access to regional trade markets, freight routes, and vital community settlements.
Engineering Standard
AASHTO / NHA Codes
Validated through in-situ density verification, bituminous Marshall stability, and certified concrete compressive testing.
Public Works Contract Active Execution

Engineering Charter & Contract Metadata

Official specifications under National Highway Authority
Client / Procuring Agency
National Highway Authority
Supervising Consultant
NESPAK
Approved PC-1 / Contract Value
Rs. 7,412.72 Million
Corridor Scope & Chainage
54.80 Km
Territory & Jurisdiction
Balochistan
Principal Prime Contractor
Progressive Technical Associates (Pvt) Ltd.
ISO 9001 • 14001 • 45001 Certified Construction

Precision Highway Engineering & Construction.

Executing Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao across Balochistan through precision rock cutting, structural stabilization, and computerized multi-layer asphalt pavement built to endure extreme axle loads and regional climate demands.

National Highway Authority Standards

Engineered Flexible Pavement Cross-Section

Multi-tier structural pavement profile engineered by Progressive PTA for Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao to ensure long-term fatigue life and heavy freight axle endurance.

Heavy National Highway Structure: 780 mm
50 mm

Asphaltic Concrete Wearing Course (ACWC)

Hot mix asphalt with 60/70 penetration bitumen, dense aggregate grading, and anti-skid macrotexture for all-weather traffic safety along Balochistan.

150°C Laydown Marshall > 1,200 kg
80 mm

Asphaltic Concrete Binder Course (ACBC)

High-shear load-distributing asphaltic intermediate course designed to prevent rutting and bottom-up fatigue cracking under heavy freight transit.

High Rut Resistance 97% Field Density
200 mm

Crushed Aggregate Base Course (ABC)

Mechanically interlocked 100% crushed hard stone aggregate with non-plastic fines, delivering optimal structural load dissipation.

100% Crushed Rock 100% Mod. Proctor
150 mm

Granular Sub-Base Course

Durable select granular layer providing positive lateral sub-drainage and capillary moisture break beneath the roadbed.

Free Drainage 98% Mod. Proctor
300 mm

Stabilized Embankment & Road Subgrade

Mechanically compacted, moisture-conditioned native earth foundation satisfying strict AASHTO T-180 and National Highway Authority specifications.

CBR ≥ 8% 95% Compaction

Core Construction Disciplines in Execution

Progressive Technical Associates mobilizes integrated earthmoving, base course processing, surfacing, and structural engineering teams across Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao (Balochistan).

Phase 01 • Earthwork Mass Earthwork & Hill Cutting

Mass Earthwork & Hill Cutting

Executing precision rock cutting, hillside formation, embankment fills, and subgrade profiling across Balochistan.

Terrain: Balochistan
Phase 02 • Base Course Base & Sub-Base Processing

Base & Sub-Base Processing

Processing 100% fractured aggregate through company crushing plants, achieving uniform moisture distribution and 100% modified Proctor density.

Density: 100% Modified AASHTO
Phase 03 • Surfacing Precision Asphalt Paving

Precision Asphalt Paving

Deployment of electronic sensor pavers and automated continuous-mix asphalt plants, guaranteeing exceptional riding smoothness and thermal fatigue resistance.

Tolerance: Laser Sensor Control
Phase 04 • Structures Hydraulic Bridges & Culverts

Hydraulic Bridges & Culverts

Construction of Structures (Box Culverts), Structures (Slab Culverts), Structures (Retaining Structures) engineered to protect against regional flash floods.

Structures: 6+ Scopes
Certified Contract Metrics • Official Engineering Benchmarks
Quality Assured Under AASHTO • NHA Specs
54.80 Km
Total Corridor Alignment
Survey Chainage
Rs. 7,412.72 Million
Approved Contract Value
Public Works Allocation
National Highway Authority
Executing Client Agency
Procuring Department
6+ Scopes
Drainage & Structures
Culverts & Bridges
Balochistan
Geographic Alignment
Regional Jurisdiction

Project Gallery & Site Operations.

Authentic photographic documentation of site operations, roadbed alignment, and heavy civil execution for Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao.

Click any photograph for enlarged full-screen view

Frequently Asked Questions.

Key details regarding the execution, engineering standards, and specifications for Rehabilitation & Up-Gradation of Bela – Awaran Road: Section Awaran – Jhaljao.

The project spans 54.80 Kilometers across Balochistan under National Highway Authority (NHA) execution, upgrading the key regional transport route with high-specification asphalt pavement.

The project engineering supervision and quality auditing are actively conducted by NESPAK under federal standards.

Comprehensive cross-drainage box culverts, slab culverts, mountain retaining walls, bridges, and erosion control structures are integrated along the 54.80 Km alignment.