Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III

Section -III (Km 102+000 to Km 171+900)
Approved Contract Budget
Rs. 13,272,470,178
National Highway Authority
Section Alignment
69.90 Km (Km 102+000 to Km 171+9...
Balochistan
Project Classification
Highway Dualization
Peace
RUNNING

Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III:

Section -III (Km 102+000 to Km 171+900)
Location: Balochistan
Client Agency: National Highway Authority
Supervising Consultant: Peace
Approved PC-1 Budget: Rs. 13,272,470,178
Corridor Alignment: 69.90 Km (Km 102+000 to Km 171+900)
Engineering Sector: Highway Dualization

Scope of Work

  • ✓ Earth Work
  • ✓ Sub-Base & Base Course
  • ✓ Surface Course & Pavement

Structures & Drainage Works

  • ✓ Structures (Box Culverts)
  • ✓ Structures (Slab Culverts)
  • ✓ Structures (Retaining Structures)
  • ✓ Structures (Bridges)
  • ✓ Drainage & Erosion Works
  • ✓ Ancillary Works

Strategic Importance & Engineering Scope.

Critical infrastructure analysis, socio-economic corridor connectivity, and comprehensive civil engineering benchmarks executed by Progressive Technical Associates.

Highway Dualization • Balochistan
Executive Engineering Mandate
Execution of high-standard civil engineering works engineered to provide reliable, long-life arterial connectivity across challenging geological and environmental terrain.

Comprehensive Project Narrative & Strategic Value

Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III constitutes a pivotal arterial development managed by Progressive Technical Associates (Pvt) Ltd. Engineered to meet strict National Highway Authority benchmarks, this corridor enhances freight transit efficiency, ensures all-weather accessibility across rugged terrain, and delivers durable highway and structural assets for long-term socio-economic growth.

Topography & Route
69.90 Km (Km 102+000 to Km 171+900)
Engineered across demanding terrain with precision rock cutting, hill excavations, and subgrade stabilization.
Socio-Economic Value
Arterial Transit Corridor
Unlocks uninterrupted access to regional trade markets, freight routes, and vital community settlements.
Engineering Standard
AASHTO / NHA Codes
Validated through in-situ density verification, bituminous Marshall stability, and certified concrete compressive testing.
Public Works Contract Active Execution

Engineering Charter & Contract Metadata

Official specifications under National Highway Authority
Client / Procuring Agency
National Highway Authority
Supervising Consultant
Peace
Approved PC-1 / Contract Value
Rs. 13,272,470,178
Corridor Scope & Chainage
69.90 Km (Km 102+000 to Km 171+900)
Territory & Jurisdiction
Balochistan
Principal Prime Contractor
Progressive Technical Associates (Pvt) Ltd.
ISO 9001 • 14001 • 45001 Certified Construction

Precision Highway Engineering & Construction.

Executing Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III across Balochistan through precision rock cutting, structural stabilization, and computerized multi-layer asphalt pavement built to endure extreme axle loads and regional climate demands.

National Highway Authority Standards

Engineered Flexible Pavement Cross-Section

Multi-tier structural pavement profile engineered by Progressive PTA for Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III to ensure long-term fatigue life and heavy freight axle endurance.

Heavy National Highway Structure: 780 mm
50 mm

Asphaltic Concrete Wearing Course (ACWC)

Hot mix asphalt with 60/70 penetration bitumen, dense aggregate grading, and anti-skid macrotexture for all-weather traffic safety along Balochistan.

150°C Laydown Marshall > 1,200 kg
80 mm

Asphaltic Concrete Binder Course (ACBC)

High-shear load-distributing asphaltic intermediate course designed to prevent rutting and bottom-up fatigue cracking under heavy freight transit.

High Rut Resistance 97% Field Density
200 mm

Crushed Aggregate Base Course (ABC)

Mechanically interlocked 100% crushed hard stone aggregate with non-plastic fines, delivering optimal structural load dissipation.

100% Crushed Rock 100% Mod. Proctor
150 mm

Granular Sub-Base Course

Durable select granular layer providing positive lateral sub-drainage and capillary moisture break beneath the roadbed.

Free Drainage 98% Mod. Proctor
300 mm

Stabilized Embankment & Road Subgrade

Mechanically compacted, moisture-conditioned native earth foundation satisfying strict AASHTO T-180 and National Highway Authority specifications.

CBR ≥ 8% 95% Compaction

Core Construction Disciplines in Execution

Progressive Technical Associates mobilizes integrated earthmoving, base course processing, surfacing, and structural engineering teams across Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III (Balochistan).

Phase 01 • Earthwork Mass Earthwork & Hill Cutting

Mass Earthwork & Hill Cutting

Executing precision rock cutting, hillside formation, embankment fills, and subgrade profiling across Balochistan.

Terrain: Balochistan
Phase 02 • Base Course Base & Sub-Base Processing

Base & Sub-Base Processing

Processing 100% fractured aggregate through company crushing plants, achieving uniform moisture distribution and 100% modified Proctor density.

Density: 100% Modified AASHTO
Phase 03 • Surfacing Precision Asphalt Paving

Precision Asphalt Paving

Deployment of electronic sensor pavers and automated continuous-mix asphalt plants, guaranteeing exceptional riding smoothness and thermal fatigue resistance.

Tolerance: Laser Sensor Control
Phase 04 • Structures Hydraulic Bridges & Culverts

Hydraulic Bridges & Culverts

Construction of Structures (Box Culverts), Structures (Slab Culverts), Structures (Retaining Structures) engineered to protect against regional flash floods.

Structures: 6+ Scopes
Certified Contract Metrics • Official Engineering Benchmarks
Quality Assured Under AASHTO • NHA Specs
69.90 Km
Total Corridor Alignment
Survey Chainage
Rs. 13,272,470,178
Approved Contract Value
Public Works Allocation
National Highway Authority
Executing Client Agency
Procuring Department
6+ Scopes
Drainage & Structures
Culverts & Bridges
Balochistan
Geographic Alignment
Regional Jurisdiction

Project Gallery & Site Operations.

Authentic photographic documentation of site operations, roadbed alignment, and heavy civil execution for Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III.

Click any photograph for enlarged full-screen view

Frequently Asked Questions.

Key details regarding the execution, engineering standards, and specifications for Dualization Of Khuzdar – Kuchlak Section Of National Highway (N-25): Section -III.

Section-III spans 69.90 Kilometers from Km 102+000 to Km 171+900 across strategic transit corridors in Balochistan under the National Highway Authority (NHA).

The project strictly adheres to National Highway Authority (NHA) General Specifications, AASHTO standards, and ASTM testing protocols for subgrade, aggregate base, and asphalt concrete.

Section-III forms an indispensable central link of National Highway N-25, seamlessly continuing the dualized corridor toward Quetta and connecting regional transport with the CPEC trade route.