Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length: - Progressive Technical Associates
Active Running Project Public Works Department (PWD) Verified · PC-1 Approved

Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length:

9.50 Km Distt Kotli AJ&K
Approved Contract Budget
Rs. 346,120,953
Public Works Department (PWD)
Section Alignment
9.50 Km (Rehan Sharif to Sawar)
Distt Kotli AJ&K
Project Classification
Road Rehabilitation & Upgradation
Supervising Consultant / PWD AJ&K
RUNNING

Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length::

9.50 Km Distt Kotli AJ&K
Location: Distt Kotli AJ&K
Client Agency: Public Works Department (PWD)
Supervising Consultant: Supervising Consultant / PWD AJ&K
Approved PC-1 Budget: Rs. 346,120,953
Corridor Alignment: 9.50 Km (Rehan Sharif to Sawar)
Engineering Sector: Road Rehabilitation & Upgradation

Scope of Work

  • ✓ Earth Work & Precision Hill Cutting
  • ✓ Sub-Base & Crushed Stone Base Course
  • ✓ Surface Course & Bituminous Pavement

Structures & Drainage Works

  • ✓ Structures (Box Culverts)
  • ✓ Structures (Retaining Structures & Breast Walls)
  • ✓ Structures (High-Level Hydraulic Bridges)
  • ✓ Drainage & Erosion Protection Chutes
  • ✓ Stabilized Shoulders & Ancillary Safety Works

Strategic Importance & Engineering Scope.

Critical infrastructure analysis, socio-economic corridor connectivity, and comprehensive civil engineering benchmarks executed by Progressive Technical Associates.

Road Rehabilitation & Upgradation • Distt Kotli AJ&K
Executive Engineering Mandate
The Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length: 9.50 Km in District Kotli, Azad Jammu & Kashmir represents a critical infra...

Comprehensive Project Narrative & Strategic Value

The Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length: 9.50 Km in District Kotli, Azad Jammu & Kashmir represents a critical infrastructure initiative executed under the Public Works Department (PWD).

This strategic mountain transit corridor traverses rugged topography to establish seamless, weather-resilient connectivity between Rehan Sharif and Sawar. Engineered under rigorous highway specifications, the project encompasses extensive mass earthworks, precision hillside cutting, formation profiling, granular sub-base, crushed stone aggregate base course, and high-performance asphaltic wearing surface.

To safeguard the alignment against monsoon torrents and flash flooding common to the Himalayan foothills, the works incorporate reinforced concrete box culverts, hillside retaining walls, breast walls, lateral drainage chutes, and paved shoulders engineered for commercial vehicular transport.

Topography & Route
9.50 Km (Rehan Sharif to Sawar)
Engineered across demanding terrain with precision rock cutting, hill excavations, and subgrade stabilization.
Socio-Economic Value
Arterial Transit Corridor
Unlocks uninterrupted access to regional trade markets, freight routes, and vital community settlements.
Engineering Standard
AASHTO / NHA Codes
Validated through in-situ density verification, bituminous Marshall stability, and certified concrete compressive testing.
Contract Remarks & Technical Scope Stipulations
Executed strictly under AJ&K PWD Standard Specifications, AASHTO standards, and certified ASTM soil compaction and bituminous Marshall stability protocols.
Public Works Contract Active Execution

Engineering Charter & Contract Metadata

Official specifications under Public Works Department (PWD)
Client / Procuring Agency
Public Works Department (PWD)
Supervising Consultant
Supervising Consultant / PWD AJ&K
Approved PC-1 / Contract Value
Rs. 346,120,953
Corridor Scope & Chainage
9.50 Km (Rehan Sharif to Sawar)
Territory & Jurisdiction
Distt Kotli AJ&K
Principal Prime Contractor
Progressive Technical Associates (Pvt) Ltd.
ISO 9001 • 14001 • 45001 Certified Construction

Precision Highway Engineering & Construction.

Executing Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length: across Distt Kotli AJ&K through precision rock cutting, structural stabilization, and computerized multi-layer asphalt pavement built to endure extreme axle loads and regional climate demands.

Public Works Department (PWD) Standards

Engineered Flexible Pavement Cross-Section

Multi-tier structural pavement profile engineered by Progressive PTA for Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length: to ensure long-term fatigue life and heavy freight axle endurance.

Heavy National Highway Structure: 780 mm
50 mm

Asphaltic Concrete Wearing Course (ACWC)

Hot mix asphalt with 60/70 penetration bitumen, dense aggregate grading, and anti-skid macrotexture for all-weather traffic safety along Distt Kotli AJ&K.

150°C Laydown Marshall > 1,200 kg
80 mm

Asphaltic Concrete Binder Course (ACBC)

High-shear load-distributing asphaltic intermediate course designed to prevent rutting and bottom-up fatigue cracking under heavy freight transit.

High Rut Resistance 97% Field Density
200 mm

Crushed Aggregate Base Course (ABC)

Mechanically interlocked 100% crushed hard stone aggregate with non-plastic fines, delivering optimal structural load dissipation.

100% Crushed Rock 100% Mod. Proctor
150 mm

Granular Sub-Base Course

Durable select granular layer providing positive lateral sub-drainage and capillary moisture break beneath the roadbed.

Free Drainage 98% Mod. Proctor
300 mm

Stabilized Embankment & Road Subgrade

Mechanically compacted, moisture-conditioned native earth foundation satisfying strict AASHTO T-180 and Public Works Department (PWD) specifications.

CBR ≥ 8% 95% Compaction

Core Construction Disciplines in Execution

Progressive Technical Associates mobilizes integrated earthmoving, base course processing, surfacing, and structural engineering teams across Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length: (Distt Kotli AJ&K).

Phase 01 • Earthwork Mass Earthwork & Hill Cutting

Mass Earthwork & Hill Cutting

Executing precision hillside rock excavation, slope formation, embankment fills, and subgrade profiling across the 9.50 Km Kotli corridor.

Alignment: 9.50 Km Mountainous
Phase 02 • Base Course Sub-Base & Crushed Base Processing

Sub-Base & Crushed Base Processing

Deploying 100% mechanically fractured crushed aggregate, moisture-controlled pugmill processing, and vibro-compaction to 100% Modified AASHTO density.

Density: 100% Modified AASHTO
Phase 03 • Surfacing Heavy-Duty Asphaltic Pavement

Heavy-Duty Asphaltic Pavement

Automated asphalt plant batching with electronic sensor paver laydown, providing durable riding quality, fatigue endurance, and weather resistance.

Pavement: Electronic Sensor Paver
Phase 04 • Structures Culverts & Mountain Retaining Walls

Culverts & Mountain Retaining Walls

Heavy reinforced concrete box culverts, stone masonry retaining walls, and roadside chute channels designed to protect slopes from flood washouts.

Structures: 5+ Structural Scopes
Certified Contract Metrics • Official Engineering Benchmarks
Quality Assured Under AASHTO • NHA Specs
9.50 Km
Total Corridor Alignment
Rehan Sharif to Sawar
Rs. 346.12 M
Approved Contract Budget
PC-1 Scope Allocation
PWD AJ&K
Executing Client Agency
Public Works Department
5+ Scopes
Hydraulic Structures
Culverts & Retaining Walls
Kotli AJ&K
Strategic Geography
Azad Jammu & Kashmir

Project Gallery & Site Operations.

Authentic photographic documentation of site operations, roadbed alignment, and heavy civil execution for Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length:.

Click any photograph for enlarged full-screen view

Frequently Asked Questions.

Key details regarding the execution, engineering standards, and specifications for Improvement & Reconditioning of Kotli Tattapani Road From Rehan Sharif To Sawar Length:.

The contract entails comprehensive rehabilitation and reconditioning across 9.50 Km from Rehan Sharif to Sawar in District Kotli, AJ&K. Scope includes mass earthworks, subgrade formation, granular sub-base, crushed aggregate base course, asphaltic concrete wearing surface, and extensive drainage infrastructure.

The project is executed for the Public Works Department (PWD AJ&K) with an approved contract value of Rs. 346,120,953 (Rs. 346.12 Million).

The works encompass reinforced concrete box culverts, hillside retaining walls, breast walls, side drains, erosion protection chutes, and stabilized road shoulders engineered for heavy commercial and community transit.