Improvement & Reconditioning of Leswa By-Pass Road

52 Km (Remaining Works of Damaged Portion 13 Km Distt Muzaffarabad/Neelum AJ&K)
Approved Contract Budget
Rs. 578,801,100
Public Works Department
Section Alignment
52 Km (Damaged Portion 13 Km)
Muzaffarabad / Neelum AJ&K
Project Classification
Highway & Road Construction
Public Works Department
RUNNING

Improvement & Reconditioning of Leswa By-Pass Road:

52 Km (Remaining Works of Damaged Portion 13 Km Distt Muzaffarabad/Neelum AJ&K)
Location: Muzaffarabad / Neelum AJ&K
Client Agency: Public Works Department
Supervising Consultant: Public Works Department
Approved PC-1 Budget: Rs. 578,801,100
Corridor Alignment: 52 Km (Damaged Portion 13 Km)
Engineering Sector: Highway & Road Construction

Scope of Work

  • ✓ Earth Work
  • ✓ Sub-Base & Base Course
  • ✓ Surface Course & Pavement

Structures & Drainage Works

  • ✓ Structures (Box Culverts)
  • ✓ Structures (Retaining Structures)
  • ✓ Structures (Bridges)
  • ✓ Drainage & Erosion Works
  • ✓ Shoulders

Strategic Importance & Engineering Scope.

Critical infrastructure analysis, socio-economic corridor connectivity, and comprehensive civil engineering benchmarks executed by Progressive Technical Associates.

Highway & Road Construction • Muzaffarabad / Neelum AJ&K
Executive Engineering Mandate
Improvement, Rehabilitation, and Reconditioning of the 52 Km Leswa By-Pass Road, focusing on the critical remaining works along the 13 Km flood-damaged mountain corridor in Di...

Comprehensive Project Narrative & Strategic Value

Improvement, Rehabilitation, and Reconditioning of the 52 Km Leswa By-Pass Road, focusing on the critical remaining works along the 13 Km flood-damaged mountain corridor in District Muzaffarabad and Neelum, Azad Jammu & Kashmir (AJ&K). Executed under the Public Works Department (PWD AJ&K), this high-priority civil works package restores vital transit flow, reinforces vulnerable cliffside slopes against flash flooding, and upgrades the highway surface to modern asphalt specifications.
Topography & Route
52 Km (Damaged Portion 13 Km)
Engineered across demanding terrain with precision rock cutting, hill excavations, and subgrade stabilization.
Socio-Economic Value
Arterial Transit Corridor
Unlocks uninterrupted access to regional trade markets, freight routes, and vital community settlements.
Engineering Standard
AASHTO / NHA Codes
Validated through in-situ density verification, bituminous Marshall stability, and certified concrete compressive testing.
Public Works Contract Active Execution

Engineering Charter & Contract Metadata

Official specifications under Public Works Department
Client / Procuring Agency
Public Works Department
Supervising Consultant
Public Works Department
Approved PC-1 / Contract Value
Rs. 578,801,100
Corridor Scope & Chainage
52 Km (Damaged Portion 13 Km)
Territory & Jurisdiction
Muzaffarabad / Neelum AJ&K
Principal Prime Contractor
Progressive Technical Associates (Pvt) Ltd.
ISO 9001 • 14001 • 45001 Certified Construction

Precision Highway Engineering & Construction.

Executing Improvement & Reconditioning of Leswa By-Pass Road across Muzaffarabad / Neelum AJ&K through precision rock cutting, structural stabilization, and computerized multi-layer asphalt pavement built to endure extreme axle loads and regional climate demands.

Public Works Department Standards

Engineered Flexible Pavement Cross-Section

Multi-tier structural pavement profile engineered by Progressive PTA for Improvement & Reconditioning of Leswa By-Pass Road to ensure long-term fatigue life and heavy freight axle endurance.

High-Altitude Alpine Structure: 650 mm
50 mm

Asphaltic Concrete Wearing Course (ACWC)

Hot mix asphalt with 60/70 penetration bitumen, dense aggregate grading, and anti-skid macrotexture for all-weather traffic safety along Muzaffarabad / Neelum AJ&K.

150°C Laydown Marshall > 1,200 kg
80 mm

Asphaltic Concrete Binder Course (ACBC)

High-shear load-distributing asphaltic intermediate course designed to prevent rutting and bottom-up fatigue cracking under heavy freight transit.

High Rut Resistance 97% Field Density
200 mm

Crushed Aggregate Base Course (ABC)

Mechanically interlocked 100% crushed hard stone aggregate with non-plastic fines, delivering optimal structural load dissipation.

100% Crushed Rock 100% Mod. Proctor
150 mm

Granular Sub-Base Course

Durable select granular layer providing positive lateral sub-drainage and capillary moisture break beneath the roadbed.

Free Drainage 98% Mod. Proctor
300 mm

Stabilized Embankment & Road Subgrade

Mechanically compacted, moisture-conditioned native earth foundation satisfying strict AASHTO T-180 and Public Works Department specifications.

CBR ≥ 8% 95% Compaction

Core Construction Disciplines in Execution

Progressive Technical Associates mobilizes integrated earthmoving, base course processing, surfacing, and structural engineering teams across Improvement & Reconditioning of Leswa By-Pass Road (Muzaffarabad / Neelum AJ&K).

Phase 01 • Earthwork Mass Earthwork & Hill Cutting

Mass Earthwork & Hill Cutting

Executing precision rock cutting, hillside formation, embankment fills, and subgrade profiling across Muzaffarabad / Neelum AJ&K.

Terrain: Muzaffarabad / Neelum AJ&K
Phase 02 • Base Course Base & Sub-Base Processing

Base & Sub-Base Processing

Processing 100% fractured aggregate through company crushing plants, achieving uniform moisture distribution and 100% modified Proctor density.

Density: 100% Modified AASHTO
Phase 03 • Surfacing Precision Asphalt Paving

Precision Asphalt Paving

Deployment of electronic sensor pavers and automated continuous-mix asphalt plants, guaranteeing exceptional riding smoothness and thermal fatigue resistance.

Tolerance: Laser Sensor Control
Phase 04 • Structures Hydraulic Bridges & Culverts

Hydraulic Bridges & Culverts

Construction of Structures (Box Culverts), Structures (Retaining Structures), Structures (Bridges) engineered to protect against regional flash floods.

Structures: 5+ Scopes
Certified Contract Metrics • Official Engineering Benchmarks
Quality Assured Under AASHTO • NHA Specs
52 Km
Total Corridor Alignment
Survey Chainage
Rs. 578,801,100
Approved Contract Value
Public Works Allocation
Public Works Department
Executing Client Agency
Procuring Department
5+ Scopes
Drainage & Structures
Culverts & Bridges
Muzaffarabad / Neelum AJ&K
Geographic Alignment
Regional Jurisdiction

Project Gallery & Site Operations.

Authentic photographic documentation of site operations, roadbed alignment, and heavy civil execution for Improvement & Reconditioning of Leswa By-Pass Road.

Click any photograph for enlarged full-screen view

Frequently Asked Questions.

Key details regarding the execution, engineering standards, and specifications for Improvement & Reconditioning of Leswa By-Pass Road.

The contract encompasses the overall 52 Km Leswa By-Pass arterial alignment, with focused high-specification reconstruction and reconditioning on the 13 Km damaged portion traversing District Muzaffarabad and Neelum, AJ&K.

The project is executed under the supervision of the Public Works Department (PWD AJ&K) following stringent highway engineering and disaster resilience standards.

The project incorporates heavy reinforced stone masonry retaining walls, wire-mesh gabions, upgraded hydraulic box culverts, side drain reconstruction, and slope stabilization designed to resist severe monsoon runoff and landslide pressures.